Wireless Communications Facilities
A. General and specific requirements for non-tower wireless communications facilities.
(1) The following regulations shall apply to all non-tower WCFs:
(a) Removal. In the event that use of a non-tower WCF is discontinued, the owner shall provide written notice to the Township of its intent to discontinue use and the date when the use shall be discontinued. Unused or abandoned WCFs or portions of WCFs shall be removed as follows:
[1] All abandoned or unused WCFs and accessory facilities shall be removed within two months of the cessation of operations at the site, unless a time extension is approved by the Township.
[2] If the WCF or accessory facility is not removed within two months of the cessation of operations at a site, or within any longer period approved by the Township, the WCF and/or associated facilities and equipment may be removed by the Township and the cost of removal assessed against the owner of the WCF.
(b) Insurance. Each person that owns or operates a non-tower WCF shall provide the Township with a certificate of insurance evidencing general liability coverage in the minimum amount of $1,000,000 per occurrence and property damage coverage in the minimum amount of $1,000,000 per occurrence covering the non-tower WCF.
(2) The following regulations shall apply to all co-located non-tower WCFs that do not substantially change the physical dimensions of the wireless support structure to which they are attached, and/or otherwise fall under the Pennsylvania Wireless Broadband Collocation Act:
(a) Permit required. WCF applicants proposing the modification of an existing tower-based WCF shall obtain a building permit from the Township. In order to be considered for such permit, the WCF applicant must submit a permit application to the Township in accordance with applicable permit policies and procedures.
(b) Permit fees. The Township may assess appropriate and reasonable permit fees directly related to the Township's actual costs in reviewing and processing the application for approval of a non-tower WCF or $1,000, whichever is less.
(c) Timing of approval for applications that fall under the WBCA. Within 30 calendar days of the date that an application for a non-tower WCF is filed with the Township, the Township shall notify the WCF applicant in writing of any information that may be required to complete such application. Within 60 calendar days of receipt of a complete application, the Township shall make its final decision on whether to approve the application and shall advise the WCF applicant in writing of such decision. The Township shall notify the WCF applicant as to completeness of the WCF application within 30 days of receipt.
(3) The following regulations shall apply to all non-tower WCFs that do substantially change the wireless support structure to which they are attached, or that otherwise do not fall under the Pennsylvania Wireless Broadband Collocation Act:
(a) Conditional use required. Any WCF applicant proposing the construction of a new non-tower WCF, or the modification of an existing non-tower WCF, shall first obtain a conditional use from the Township. New constructions, modifications, and replacements that do fall under the WBCA shall not be subject to the conditional use process. The conditional use application shall demonstrate that the proposed facility complies with all applicable provisions in the Swatara Township Zoning Ordinance.
(b) Retention of experts. The Township may hire any consultant(s) and/or expert(s) necessary to assist the Township in reviewing and evaluating the application for approval of the WCF and, once approved, in reviewing and evaluating any potential violations of the terms and conditions of these WCF provisions. The WCF applicant and/or owner of the WCF shall reimburse the Township for all costs of the Township's consultant(s) in providing expert evaluation and consultation in connection with these activities.
(c) Permit fees. The Township may assess appropriate and reasonable permit fees directly related to the Township's actual costs in reviewing and processing the application for approval of a non-tower WCF, as well as related inspection, monitoring and related costs.
(d) Development regulations. Non-tower WCFs shall be co-located on existing wireless support structures, such as existing buildings or tower-based WCFs, subject to the following conditions:
[1] The total height of any wireless support structure and mounted WCF shall not exceed 20 feet above the maximum height permitted in the underlying zoning district, unless the WCF applicant applies for, and subsequently obtains, a variance.
[2] In accordance with industry standards, all non-tower WCF applicants must submit documentation to the Township justifying the total height of the non-tower WCF. Such documentation shall be analyzed in the context of such justification on an individual basis.
[3] If the WCF applicant proposes to locate the related equipment in a separate building, the building shall comply with the minimum requirements for the applicable zoning district, and landscaping shall be required to screen as much of the equipment building as possible. An evergreen screen of at least four feet shall surround the site.
(e) A security fence with a minimum height of eight feet shall surround any separate communications equipment building. Vehicular access to the communications equipment building shall not interfere with the parking or vehicular circulation on the site for the principal use.
(f) Removal, replacement and modification.
[1] The removal and replacement of non-tower WCFs and/or accessory equipment for the purpose of upgrading or repairing the WCF is permitted, so long as such repair or upgrade does not substantially change the overall size of the WCF or the number of antennas.
[2] Any material modification to a WCF shall require notice to be provided to the Township and possible supplemental permit approval to the original permit or authorization.
(4) Regulations applicable to all non-tower WCFs located in the public rights-of-way. In addition to the non-tower WCF provisions listed in Subsection B, the following regulations shall apply to non-tower WCFs located in the public rights-of-way:
(a) Co-location. Non-tower WCFs in the ROW shall be co-located on existing poles, such as existing utility poles or light poles. If co-location is not technologically feasible, the WCF applicant, with the Township's approval, shall locate its non-tower WCF on existing poles or freestanding structures that do not already act as wireless support structures.
(b) Relocation or removal of facilities. Within 60 days following written notice from the Township, or such longer period as the Township determines is reasonably necessary or such shorter period in the case of an emergency, an owner of a WCF in the ROW shall, at its own expense, temporarily or permanently remove, relocate, change or alter the position of any WCF when the Township, consistent with its police powers and applicable Public Utility Commission regulations, shall have determined that such removal, relocation, change or alteration is reasonably necessary under the following circumstances:
[1] The construction, repair, maintenance or installation of any Township or other public improvement in the right-of-way;
[2] The operations of the Township or other governmental entity in the right-of-way;
[3] Vacation of a street or road or the release of a utility easement; or
[4] An emergency as determined by the Township.
B. General and specific requirements for all tower-based wireless communications facilities.
(1) The following regulations shall apply to all tower-based wireless communications facilities:
(a) Notice. Upon submission of an application for a tower-based WCF and the scheduling of the public hearing upon the application, the WCF applicant shall mail notice to all owners of every property within 500 feet of the proposed facility. The WCF applicant shall provide proof of the notification to the Township.
(b) Conditional use authorization required. Tower-based WCFs are permitted in certain zoning districts by conditional use, and at a height necessary to satisfy their function in the WCF applicant's wireless communications system. No WCF applicant shall have the right under these regulations to erect a tower to the maximum height specified in this section unless it proves the necessity for such height. The WCF applicant shall demonstrate that the antenna/tower/pole for the tower-based WCF is the minimum height necessary for the service area.
[1] Prior to the Board's approval of a conditional use authorizing the construction and installation of a tower-based WCF, it shall be incumbent upon the WCF applicant for such conditional use approval to prove to the reasonable satisfaction of the Board that the WCF applicant cannot adequately extend or infill its communications system by the use of equipment such as redoes, repeaters, antenna(s) and other similar equipment installed on existing structures, such as utility poles or their appurtenances and other available tall structures. The WCF applicant shall further demonstrate that the proposed tower-based WCF must be located where it is proposed in order to serve the WCF applicant's service area and that no other viable alternative location exists.
[2] The conditional use application shall be accompanied by a propagation study evidencing the need for the proposed tower or other communication facilities and equipment, a description of the type and manufacturer of the proposed transmission/radio equipment, the frequency range (megahertz band) assigned to the WCF applicant, the power in watts at which the WCF applicant transmits, and any relevant related tests conducted by the WCF applicant in determining the need for the proposed site and installation.
[3] The conditional use application shall be accompanied by documentation demonstrating that the proposed tower-based WCF complies with all state and federal laws and regulations concerning aviation safety.
[4] Where the tower-based WCF is located on a property with another principal use, the WCF applicant shall present documentation to the Board of Commissioners that the owner of the property has granted an easement for the proposed WCF and that vehicular access will be provided to the facility.
[5] The conditional use application shall be accompanied by documentation demonstrating that the proposed tower-based WCF complies with all applicable provisions in this section.
(c) Engineer inspection. Prior to the Township's issuance of a permit authorizing construction and erection of a tower-based WCF, a structural engineer registered in Pennsylvania shall issue to the Township a written certification of the proposed WCF's ability to meet the structural standards offered by either the Electronic Industries Association or the Telecommunications Industry Association and certify the proper construction of the foundation and the erection of the structure. This certification shall be provided during the conditional hearings or at a minimum be made as a condition attached to any approval given such that the certification be provided prior to issuance of any building permits.
(d) Co-location and siting. An application for a new tower-based WCF shall demonstrate that the proposed tower-based WCF cannot be accommodated on an existing or approved structure or building, or sited on land owned and maintained by Swatara Township. The Board of Commissioners may deny an application to construct a new tower-based WCF if the WCF applicant has not made a good-faith effort to mount the commercial communications antenna(s) on an existing structure. The WCF applicant shall demonstrate that it contacted the owners of tall structures, buildings, and towers within a one-fourth-mile radius of the site proposed, sought permission to install an antenna on those structures, buildings, and towers and was denied for one of the following reasons:
[1] The proposed antenna and related equipment would exceed the structural capacity of the existing building, structure or tower, and its reinforcement cannot be accomplished at a reasonable cost.
[2] The proposed antenna and related equipment would cause radio frequency interference with other existing equipment for that existing building, structure, or tower and the interference cannot be prevented at a reasonable cost.
[3] Such existing buildings, structures, or towers do not have adequate location, space, access, or height to accommodate the proposed equipment or to allow it to perform its intended function.
[4] A commercially reasonable agreement could not be reached with the owner of such building, structure, or tower.
(e) Permit required for modifications. To the extent permissible under applicable state and federal law, any WCF applicant proposing the modification of an existing tower-based WCF, which increases the overall height of such WCF, shall first obtain a permit from the Township. Nonroutine modifications shall be prohibited without a permit.
(f) Gap in coverage. A WCF applicant for a tower-based WCF must demonstrate that a significant gap in wireless coverage or capacity exists with respect to all wireless operators in the applicable area and that the type of WCF being proposed is the least-intrusive means by which to fill that gap in wireless coverage. The existence or nonexistence of a gap in wireless coverage shall be a factor in the Township's decision on an application for approval of tower-based WCF.
(g) Additional antennas. As a condition of approval for all tower-based WCFs, the WCF applicant shall provide the Township with a written commitment that it will allow other service providers to co-locate antennas on tower-based WCFs where technically and economically feasible. The owner of a tower-based WCF shall not install any additional antennas without obtaining the prior written approval of the Township.
(h) Lighting. No tower-based WCF shall be artificially lighted, except as required by law. If lighting is required, the WCF applicant shall provide a detailed plan for sufficient lighting, demonstrating as unobtrusive and inoffensive an effect as is permissible under state and federal regulations. The WCF applicant shall promptly report any outage or malfunction of FAA-mandated lighting to the appropriate governmental authorities and to the Township Secretary.
(i) Retention of experts. The Township may hire any consultant and/or expert necessary to assist the Township in reviewing and evaluating the application for approval of the tower-based WCF and, once approved, in reviewing and evaluating any potential violations of the terms and conditions of these provisions. The WCF applicant and/or owner of the WCF shall reimburse the Township for all costs of the Township's consultant(s) in providing expert evaluation and consultation in connection with these activities.
(j) Timing of approval. Within 30 calendar days of the date that an application for a tower-based WCF is filed with the Township, the Township shall notify the WCF applicant, in writing, of any information that may be required to complete such application. All applications for tower-based WCFs shall be acted upon within 150 days of the receipt of a fully completed application for the approval of such tower-based WCF, and the Township shall advise the WCF applicant, in writing, of its decision. If additional information was requested by the Township to complete an application, the time required by the WCF applicant to provide the information shall not be counted toward the one-hundred-fifty-day review period.
(k) Removal. In the event that use of a tower-based WCF is planned to be discontinued, the owner shall provide written notice to the Township of its intent to discontinue use and the date when the use shall be discontinued. Unused or abandoned WCFs or portions of WCFs shall be removed as follows:
[1] All unused or abandoned tower-based WCFs and accessory facilities shall be removed within 90 days of the cessation of operations at the site, unless a time extension is approved by the Township.
[2] If the WCF and/or accessory facility is not removed within 90 days of the cessation of operations at a site, or within any longer period approved by the Township, the WCF and accessory facilities and equipment may be removed by the Township and the cost of removal assessed against the owner of the WCF.
[3] Any unused portions of tower-based WCFs, including antennas, shall be removed within 90 days of the time of cessation of operations. The Township must approve all replacements of portions of a tower-based WCF previously removed.
(l) Permit fees. The Township may assess appropriate and reasonable permit fees directly related to the Township's actual costs in reviewing and processing the application for approval of a tower-based WCF, as well as related inspection, monitoring, and related costs.
(m) FCC license. Each person that owns or operates a tower-based WCF over 40 feet in height shall submit a copy of its current FCC license, including the name, address, and emergency telephone number for the operator of the facility.
(n) Insurance. Each person that owns or operates a tower-based WCF greater than 40 feet in height shall provide the Township with a certificate of insurance evidencing general liability coverage in the minimum amount of $5,000,000 per occurrence and property damage coverage in the minimum amount of $5,000,000 per occurrence covering the tower-based WCF. Each person that owns or operates a tower-based WCF 40 feet or less in height shall provide the Township with a certificate of insurance evidencing general liability coverage in the minimum amount of $1,000,000 per occurrence and property damage coverage in the minimum amount of $1,000,000 per occurrence covering each tower-based WCF.
(o) Indemnification. Each person that owns or operates a tower-based WCF shall, at its sole cost and expense, indemnify, defend and hold harmless the Township, its elected and appointed officials, employees and agents, at all times against any and all claims for personal injury, including death, and property damage arising in whole or in part from, caused by or connected with any act or omission of the person, its officers, agents, employees or contractors arising out of, but not limited to, the construction, installation, operation, maintenance or removal of the tower-based WCF. Each person that owns or operates a tower-based WCF shall defend any actions or proceedings against the Township in which it is claimed that personal injury, including death, or property damage was caused by the construction, installation, operation, maintenance or removal of a tower-based WCF. The obligation to indemnify, hold harmless and defend shall include, but not be limited to, the obligation to pay judgments, injuries, liabilities, damages, reasonable attorneys' fees, reasonable expert fees, court costs and all other costs of indemnification.
(p) Financial security. Prior to receipt of a zoning permit for the construction or placement of a tower-based WCF, the WCF applicant shall provide to the Township financial security sufficient to guarantee the removal of the tower-based WCF. Said financial security shall remain in place until the tower-based WCF is removed.
(2) The following regulations shall apply to tower-based wireless communications facilities located outside the public rights-of-way:
(a) Surrounding environs.
[1] The WCF applicant shall ensure that the existing vegetation, trees and shrubs located within proximity to the WCF structure shall be preserved to the maximum extent possible.
[2] The WCF applicant shall submit a soil report to the Township complying with the standards of Appendix I: Geotechnical Investigations, ANSI/EIA-222, as amended, to document and verify the design specifications of the foundation of the tower-based WCF, and anchors for guy wires, if used.
(b) Access road. An access road, turnaround space and parking shall be provided to ensure adequate emergency and service access to the tower-based WCF. The access road shall be a dust-free, all-weather surface for its entire length. Maximum use of existing roads, whether public or private, shall be made to the extent practicable. Road grades shall closely follow natural contours to assure minimal visual disturbance and minimize soil erosion. Where applicable, the WCF owner shall present documentation to the Township that the property owner has granted an easement for the proposed facility.
(3) The following regulations shall apply to tower-based wireless communications facilities located in the public rights-of-way:
(a) Relocation or removal of facilities. Within 60 days following written notice from the Township, or such longer period as the Township determines is reasonably necessary or such shorter period in the case of an emergency, an owner of a tower-based WCF in the ROW shall, at its own expense, temporarily or permanently remove, relocate, change or alter the position of any WCF when the Township, consistent with its police powers and applicable Public Utility Commission regulations, shall determine that such removal, relocation, change or alteration is reasonably necessary under the following circumstances:
[1] The construction, repair, maintenance or installation of any Township or other public improvement in the right-of-way;
[2] The operations of the Township or other governmental entity in the right-of-way;
[3] Vacation of a street or road or the release of a utility easement; or
[4] An emergency as determined by the Township.
(b) Reimbursement for ROW use. In addition to permit fees as described in this section, every tower-based WCF in the ROW is subject to the Township's right to fix annually a fair and reasonable fee to be paid for use and occupancy of the ROW. Such compensation for ROW use shall be directly related to the Township's actual ROW management costs, including, but not limited to, the costs of the administration and performance of all reviewing, inspecting, permitting, supervising and other ROW management activities by the Township. The owner of each tower-based WCF shall pay an annual fee to the Township to compensate the Township for the Township's costs incurred in connection with the activities described above.
See § 295-55: Wireless communications facilities for more detailed information on these facilties.
See Permit Application Forms for more information.